How to Define the Scope of Supply Before Buying a Skid Package

Skid-mounted ultrafiltration and reverse osmosis unit with membrane housings, valves, gauges and touchscreen panel

A skid is an integrated package, not a few products placed on a base frame. A useful scope statement must spell out what is included and where the package connects to the rest of the project.

Draw the boundaries first

Mark the inlets, outlets, drains, vents, power and signal connections on the process drawing. Then mark each pump, valve, instrument, pipework section, base frame and control system as included, excluded or to be confirmed. Besides overall dimensions, state the operating conditions and maintenance clearances.

Assign a responsible party for design, selection, assembly, inspection and document approval. When the project provides the process design, assembly work must not be assumed to include a process performance guarantee.

Agree what the tests actually prove

Distinguish dimensional checks, pressure or leak tests where applicable, electrical checks and functional tests, and define the approved procedure, acceptance criteria, witnessing and records. A trial run with clean water does not necessarily prove performance with other process fluids.

You can send KFE your process requirements, interface drawings and scope matrix, and we will coordinate the relevant partner manufacturers. Coordination is not the same as in-house design or testing facilities; engineering responsibility, test scope and performance commitments must be agreed in writing before release.

Related industry: Chemical & Pharmaceutical

Related Products

Send Us Your Equipment List or Operating Conditions

Tell us what you need. KFE handles the quote, specs and delivery, with one contact for you.

Contact KFE