Replacing a boiler feed pump cannot be based on motor power alone. Record feedwater temperature and pressure, minimum and normal flow, head, suction layout, start-up conditions, and whether operation is continuous or parallel. Add materials, seals, drive, coupling, baseplate and connected valves. The old curve and recent readings are evidence, not a complete new specification. Check nozzle sizes, allowable loads, control signals, recirculation and maintenance space; ask the manufacturer for curves and NPSH data at the actual hot water conditions, and compare on the same criteria. Send the duty sheet, old data and drawings to KFE for coordination. High-temperature pressurised equipment and protection settings must be reviewed by qualified project personnel.
Procurement Fields
For each item, record “confirmed value, source document, open issue, reviewer, revision”. Keep measured data separate from design assumptions.
Comparison and Limits
Proposed configurations must be compared on the same media and duty. Catalogue maximums, certificates for other models or matching dimensions are not general guarantees.
Data to Submit
Submit the equipment tag, duty range, interface drawings, project requirements and a list of missing data. KFE can coordinate documents; final approval remains with the project engineers.
Related industry: Metals & Power Generation




